ABB ACS310 Drive
1
Posts
1
Users
0
Reactions
299
Views
Jun 22, 2024 12:04 pm
Optimize your ABB ACS310 drive performance by configuring parameters like motor data, control mode, ramp times, and more. This guide provides a comprehensive overview for efficient setup.
Here is step by step programming of ABB ACS310 drive:
Step 1 – control wiring
Connect all control wiring for start/stop and speed reference. Below image show control wiring of ACS310 drive.
Step 2 – Power wiring
Connect input power wiring and motor wiring to the drive. Below image show power wiring of ACS310 drive.
Step 3 – Parameters
Below list show all parameter used in ACS310 drive programming.
Motor Data | Â | Â | Â |
 |  |  |  |
Macro | 9902 | 1 | Â |
Motor Voltage | 9905 | …… | V |
Motor Current | 9906 | …… | A |
Motor Frequency | 9907 | …… | Hz |
Motor Speed (rpm) | 9908 | …… | rpm |
Motor Power KW | 9909 | …… | KW |
 |  |  |  |
Limits | Â | Â | Â |
 |  |  |  |
Minimum Frequency | 2007 | …… | Hz |
Maximum Frequency | 2008 | …… | Hz |
 |  |  |  |
ACC Time 1 | 2202 | …… | s |
DEC Time 1 | 2203 | …… | s |
Step 4 – Testing and Verification
- Start the Motor: Once programming is complete, you can initiate motor operation using the start/stop buttons on the control panel or through external control signals if configured.
- Monitor Performance: Observe the motor's operation and verify it functions as intended. If adjustments are needed, return to parameter setting mode and fine-tune the settings
Â