Siemens SINAMICS S120/S150 Drive
1
Posts
1
Users
0
Reactions
318
Views
Feb 21, 2024 5:22 am
Cause : PB/PN clock cycle synchronous operation clock cycle failure comes when the global control telegram to synchronize the clock cycles has failed - in cyclic operation - for several DP clock cycles or has violated the time grid specified in the parameterizing telegram over several consecutive DP clock cycles (refer to the bus cycle time, Tdp and Tpllw).
- check the physical bus configuration (cable, connector, terminating resistor, shielding, etc.).
- check whether communication was briefly or permanently interrupted.
- check the bus and controller for utilization level (e.g. bus cycle time Tdp was set too short).